Highway roads Developments
Location
Thessaloniki-Athens Corridor, Greece
Status
Completed
Size
120 km
Type
Multi-Lane Highway
Working Days
450 Working Days
The Highway Roads Development project by Orion Construction is a transformative infrastructure initiative designed to enhance regional connectivity, improve transportation efficiency, and ensure long-term durability. Highways serve as the backbone of economic growth, enabling the smooth movement of goods, services, and people. This project reflects our commitment to delivering high-quality road networks that reduce traffic congestion, promote safety, and support sustainable development.
At the core of this highway development is advanced engineering and precision planning. Our team of experts has carefully designed each segment using cutting-edge surveying techniques, 3D modeling, and geotechnical analysis to ensure the road is built on a stable foundation. The use of high-performance asphalt, reinforced concrete, and weather-resistant coatings extends the lifespan of the highway, minimizing the need for frequent repairs and reducing long-term maintenance costs. One of the primary objectives of this project is to alleviate traffic congestion and improve travel efficiency. By incorporating wider lanes, dedicated express corridors, and smart traffic management systems, this highway allows for seamless vehicular movement, reducing delays and enhancing road capacity. Additionally, well-planned entry and exit ramps, strategically located rest stops, and efficient toll booth operations ensure that traffic flows smoothly without unnecessary bottlenecks.
Project Milestones

February 2023
Route Planning & Environmental Assessment
A detailed topographical survey, traffic impact study, and environmental analysis were conducted to determine the best alignment for the highway. Sustainable construction practices were planned to minimize ecological disruption.

June 2023
Groundwork & Foundation Preparation
Land clearing, excavation, and soil stabilization techniques were implemented to ensure a strong foundation. Cutting-edge geosynthetic reinforcement methods were used to enhance structural integrity.

October 2023
Pavement Construction & Drainage Systems
High-performance asphalt and reinforced concrete layers were applied to withstand heavy traffic loads. Advanced stormwater drainage systems were installed to prevent water accumulation and erosion.

January 2024
Safety Features & Smart Infrastructure
Installation of LED roadway lighting, traffic management systems, signage, and safety barriers ensured compliance with international highway safety standards. Smart traffic monitoring sensors were integrated to improve real-time traffic flow.

April 2024
Final Testing & Public Access
After extensive load testing, speed assessments, and quality inspections, the highway was officially opened for public use. The project has significantly reduced travel times, improved logistics, and enhanced regional economic growth.